Parade of Homes 2006 Town of Cicero
at The Crossings
Sciuga 2006
Parade Home under construction
June 14, 2006
July 11, 2006
July 11, 2006
Aug. 10, 2006
Sept. 10, 2006
The traditional ranch showcases wide plank hardwood floors, remote-controled screens on the porch, a coffee bar in the master bedroom suite and a lower-level exercise room with a full bath, Pergo floors, a mirrored wall and dance bar.